Basic Info.
Type
Slow EV Charging Station
Product Description
Linbai electric AC 7kW 32A Charging pile
1.1 Fixed installation of pile body
Installation tools: cross screwdriver, hexagonal wrench, percussion drill, test pen, multimeter.
Recommended cable specifications for power supply and communication (networking mode) of charging pile are as follows:
Name of the cable | Cable specifications | Length | Note |
Power cord | 3*6mm2 and above single phase power cable | Subject to the specific construction length | |
Communication line | Shielded network cable (Class 5) | Subject to the specific construction length | Ethernet Operation Edition |
Installation precautions:
1. Before installation, please check whether there are scratches and rust on the surface of the workpiece.
2. Do not let sharp tools scratch products and parts during installation, avoid scratches between parts caused by each other's appearance scars, and pay attention to the use of tools, pay attention to personal safety.
Pile installation:
1, as shown in the figure, use the impact drill to make three holes in the wall;
2. Insert expansion screws into the two holes above, lock and adjust the screws;
3. Hang the charging pile;
4. Unscrew the two cover screws on the side, open the charging pile, and lock the following screw with the expansion screw;
5. Access input line L/N/PE according to 1.2;
6. Close the cover and lock the two cover screws.
1.2Electrical installation
Power low-voltage distribution room charging pile front distribution box (leakage protection) AC charging pile electric vehicle
Charging pile input line connection (access according to the mark)
When the equipment is used, it must be grounded. The test pen in the accessory package must be used to test the fire line (L), the zero line (N), the light of the electric pen test is the fire line (L), and then the L line and the N line are respectively connected to the corresponding terminals!
Safety warning: in order to ensure safe charging, the user must connect the input line in strict accordance with the phase sequence requirements of the input line terminals.At the same time, the rated current of 32A charging pile, the input line is not less than 6 square copper core line;Rated current of 16A charging pile, the input line is not less than 4 square copper core wire.(After wiring is finished, put it back into the lead mouth of the column or protect it with a protective cover to prevent exposure and accidental collision.)
The electrical debugging
1) Pre-operation check:
AC pile installation location for easy operation and maintenance
AC pile and accessories should be properly connected and firmly installed
Reasonable selection of AC inlet leakage protection switch (40A leakage protection for 7KW and 20A leakage protection for 3.5KW)
No external objects or parts are left on top of the AC pile
2) Power on the equipment:
1. Make sure the above pre-operation inspection items meet the requirements
2. Close the leakage protection of the incoming power line
3. Power on AC pile:
Normal standby: blue light is always on
Equipment failure: red light flashing
Charging: green light flashing
3) System setup and networking:
For charging piles of the standard operating version, initial configuration and networking operation are required:
Ethernet version using standard crystal head (RJ-45) to connect to the switch, from the main computer direct connection mode;
The GPRS version uses an antenna to connect 2G/3G/4G network signals and send data to the cloud platform for connection.
2.1The charging connection
After the electric vehicle owner puts the electric vehicle into the stack and stops, he/she takes the charging gun off the pile and inserts it into the charging seat of the electric vehicle. Please carefully check whether it is inserted in place to ensure reliable connection.
2.2 Charging on
1) Instantly plug in and charge the version, directly plug in the charging gun for charging.
2) For the charging pile of the swipe card version, in addition to ensuring that the charging gun is reliably inserted into the electric vehicle, it also needs to receive the charging control command before charging the electric vehicle.Charging control instructions may come from the card reader (IC card), charging APP or WeChat public account.
3) Charging control by swiping card: the user correctly connects the charging gun, uses the swiping area of the configured IC card swiping card close to the charging pile, and starts charging (green flashing when charging is normal).Before charging the end of the operation, please be sure to swipe the card settlement before drawing the gun, otherwise it will cause the lock card.(If the card is locked, please contact the management office)
4) Charging through the WeChat official account: Electric owners can also charge by following the WeChat official account.The owner finds an available idle charging pile nearby, parks the car in the parking space, and then enters the charging control interface of the pile by scanning the code button in the WeChat public account and scanning the two-dimensional code on site. After connecting the charging gun, the owner clicks "Start Charging" to charge the electric car.
2.3 Charging stop
When the charging pile is in working state, the owner needs to end the charging, which can be done in the following ways:
1) plug in and charge the version directly pull the gun to end the charging.
2) Settle by credit card, and draw the gun after successful deduction.When the car is fully charged, the on-board controller will automatically stop charging.Please be sure to swipe the card settlement before drawing the gun, otherwise it will cause the lock card.(If the card is locked, please contact the management office)
3) Click "Stop Charging" on the mobile terminal (APP or WeChat official account), and then pull the gun.
Address:
Xiang Yang Qiao Industrial Park, Liushi Town, Yueqing City, Wenzhou, Zhejiang, China
Business Type:
Manufacturer/Factory, Trading Company
Business Range:
Electrical & Electronics, Industrial Equipment & Components
Management System Certification:
ISO 9001, ANSI/ESD, ISO 22000
Company Introduction:
Our company offers variety of products which can meetyour multifarious demands. We adhere to the management principles of " Qualityfirst, customer first and credit-based" Since theestablishment of the company and always do our best to satisfy potential needsof our customers. Our company is sincerely willing to cooperate withenterprises from all over the world in order to realize a win-win situationsince the trend of economic globalization has developed with anirresistible force.
Established in 2012, ZHEJIANG LINBAI ELECTRIC Co., Ltd. Specializes in manufacturing Solar PV product. Located in WENZHOU we enjoy convenient access to major transportation networks. Guaranteeing stable and timely supply, credible quality and sincere service, our products sell well in both domestic and overseas markets. If you are interested in any of our products, or wish to place a customized order, please contact us. We will do our best to meet your needs.
The wide range products under our manufacturing covers DC Circuit Breaker, Surge Protector Device, DC MCCB, Fuse, Isolator switch, PV Combiner box, Solar Cable, MC4 Connector, Distribution Box and Switch. All products are in strict accordance with the international Electrotechnical Commission standards and national and industry standsard production.